As shown this job had already been started when these photographs were taken. We had already hacked off the rear of the house.

We built up the larger of the windows to match the existing height of the narrower window and then fitted new, pupose made, concrete sills. We also installed a new Code 4 lead apron.
We then stripped off the existing roof covering, fitted new timbers and finished with new low profile rooftiles.
We renewed the rainwater gutters and facias to the main house and kitchen roof.

 
The photographs below show a before and after shot of the rear of a terraced house which was hacked off, re-rendered and finished in a float finish. The existing perspex, corrugated asbestos sheets and timbers were removed.
New roof timbers were fitted into place and covered in breathable roofing felt and battened then covered in low profile concrete roof tiles, code 4 lead aprons were fitted together with flashings.
New purpose made concrete sill fitted to small window.
The corrugated perspex roof was replaced with polycarbonate triple glaze pvc with twinfix bars.
New pvc facia and rainwater gutters and pipes were fitted into place.
New pvc windows and doors fitted in light oak with tilt and turn windows above the conservatory roof and above the tile roof for easy cleaning.
The old corrugated asbestos sheets were disposed of correctly and safely by controlled waste management.
 
The photographs below show a before and after of a slate roof which was changed due to the pitch of roof being to low for slates.
Lead aprons were fitted in place around where the roof meets the wall and a twin wall clear dome was then fitted.
 
The photographs below show a corregated asbestos roof which was ripped off and replaced with new roof trusses to increase the pitch of the roof in order that roof tiles could be fitted.
The window was built up approx 500ml and a purpose made concrete sill together with a tilt and turn window fitted in place.
Code 4 lead apron fitted where the roof meets the wall and made good with next door's roof with lead flashings.
Then felt and batten were fitted and a low profile together with low pitch roof tiles put in place.
The corregated asbestos roof were safely disposed of by Tarangs waste management.
 
The photographs below show a corregated asbestos roof that was ripped off.
The front of the building was built up approx 500ml then new roof timbers were installed, covered with board and finally covered with fiberglass, new upvc facia and gutters fitted.

The corregated asbestos roof were safely disposed of by Tarangs waste management.
 
The photographs below show a before and after of a felt roof with a water channel in the centre together with an old conservatory roof.
The old conservatory roof and felt roof were removed.
A new conservatory roof was constructed with triple glaze polycarbonate and white metal glazing bars.
White upvc windows were fitted on the vertical front part and a lead apron was fitted under the window where the roof meets the cladding.
The roof was then boarded and covered with fiberglass.